32 - What is the sequence that should be used when upgrading R/3 Systems in a multi-system landscape environment?
Click on the button next to the right answer.
A. The systems should be upgraded in the sequence defined in the transport path.
B. All the systems should be upgraded simultaneously to save time.
C. The production system should be upgraded first.
D. The sequence depends upon the database backup implementation timetable.
E. The upgrade sequence is dependent upon the project managers availability.
33 - Which of the following is NOT a factor in R/3 upgrade planning strategy?
Click on the button next to the right answer.
A. Determine the sequence of upgrading all systems in the system group.
B. System downtime for data backups before and after the upgrade.
C. Duration of the upgrade.
D. Whether or not all SAP prerequisites can be met prior to the upgrade.
E. Whether or not all of the R/3 user frontend PC's use Microsoft Windows 95 or Windows for Workgroups.